Frequently asked questions
The questions we get asked most, answered properly. If yours is not here, ring us on 0800 870 8086 and ask.
- 9.97/10 Checkatrade
- 5.0 Google
- 4.9 Trustpilot
Spray foam
My lender has flagged spray foam. How fast can you move?
In most cases we can survey within a few days and give you a written price the same day. Removal is usually one to three days depending on how much foam is up there and how it was applied.
Why do lenders object to spray foam?
Two reasons. With foam in place nobody can inspect the timbers, battens or felt, so the condition of the roof is unknown. And foam sprayed to the underside of the roof usually seals the eaves, so the loft stops ventilating and moisture has nowhere to go.
Will removal damage the roof?
Closed cell foam bonds hard, so removal is slow physical work. Done by hand it comes back to sound timber. If the felt underneath has already failed we tell you at survey, not halfway through.
Can you remove just some of it?
No, and anyone offering to is not solving your problem. A partial removal leaves the roof partly uninspectable, which is what the lender objected to.
Do I get a certificate?
Yes. A Certificate of Removal, a written scope of works and dated photographs of the cleared roof. Nobody can promise what a surveyor decides, but that is what they ask to see.
Loft insulation and boarding
How deep should loft insulation be?
Current guidance is around 270–300mm of mineral wool. Many lofts we open have 100mm from when the house was built, about a third of what it should be.
Why not lay new insulation over the old?
Sometimes that is fine and we will say so. But if the old material is compressed, damp or full of debris, covering it buys depth on paper and very little in the rooms below.
Can I board over my insulation?
Not directly onto the joists. A joist is about 100mm deep and the insulation should be 270–300mm, so boards laid straight on top compress it and create cold spots. We raise the deck on legs instead.
How long does a loft take?
A straightforward loft is a day. If the old insulation has to come out first, or the loft is part boarded, allow a day and a half.
How much mess is there?
It is filthy work, so we sheet the route from the front door to the hatch, bag everything in the loft rather than dropping it, and hoover afterwards.
Damp
How do you know it is rising damp and not something else?
By looking outside as well as inside. A tide mark under a metre with salt staining behaves differently from a patch that tracks the weather, or mould that appears in cold corners. Those are three different problems with three different fixes.
How long before I can decorate?
New plaster needs to dry out properly, typically several weeks depending on the room and time of year. Painting too early traps moisture and it comes back through.
How long does a damp course last?
Our damp proofing work carries a 25-year guarantee, with the terms written into your quotation before you agree to anything.
Will the mould come back?
Not if the cause has been dealt with. If it was condensation rather than damp, the fix is ventilation rather than injection, and we will tell you that even though it is the smaller job.
Surveys, prices and guarantees
Is the survey really free?
Yes. No fee, no obligation, and no pressure to decide on the day.
How long is a quote valid?
30 days. It is fixed — everything included, nothing added on the day.
Do you take a deposit?
10% to book, with the balance on completion. Never on the doorstep.
What guarantee do I get?
10 years on workmanship, 25 years on damp proofing, issued within 48 hours of final payment. The terms are in the quotation before you agree.
What if you find extra work once you start?
We stop, show you, and price it before going any further. Nothing gets added to the bill without you agreeing to it first.
Do you cover my area?
We work from Manchester and Sevenoaks across most of England. Check the areas page or call 0800 870 8086.
Our company is a top-rated service provider
40 Checkatrade reviews in the last 12 months £2 million public liability 10-year workmanship guarantee, 25 years on damp proofing
Evidence-led work
Recent jobs, start to finish
Spray Foam Removal · SheffieldSpray Foam Removal in Sheffield: 50m² Loft Restored50m² · Five working days
Loft Insulation · ManchesterLoft Insulation in Manchester: 100m² Reinsulated to 300mm100m² · Two days- Loft Boarding · PrestonLoft Boarding in Preston: 74m² of Storage Without Crushing the Insulation74m² · Three days
Damp Proofing · ManchesterDamp Proofing in Manchester: Entrance Hall Taken Back and Replastered
Spray Foam Removal · BournemouthSpray Foam Removal in Bournemouth: Roof Reopened and Reinsulated
Loft Insulation · LeedsLoft Insulation in Leeds: Old Insulation Out, 300mm In, 15m² Boarded
Loft Boarding · NottinghamLoft Insulation and Boarding in Nottingham: Raised Deck Over New Wool
Free survey, and a price in writing
No obligation, no doorstep sales. If we are not the right people for the job, we will tell you that instead.
